A proposed scheme, not yet available. The RAS is well developed but still needs Government to pass enabling legislation. This site explains to councils, elected members and the public what could be coming. Where it is at

Wellington · District council · NPS-UD Tier 1

Kāpiti Coast District Council

Support in principle Last updated 2 October 2026 Latest on record: 3 September 2026 Products live: none yet

Kāpiti Coast District Council has resolved to support the RAS in principle. In-principle support 3 September 2026, the 24th council to do so.

Council papers (members)
A farmer plugging in an electric ute beside a corrugated iron shed on a frosty morning

Local voices

What Kāpiti Coast is saying.

Quotes from the public record, with the source linked.

Our community is facing significant cost pressures and this scheme will be another way we can help our community to meet everyday costs in challenging times.
Janet Holborow
Mayor, Kāpiti Coast District Council, 3 September 2026 · Source
It's something that would have benefits not only to our people but to our environment.
Janet Holborow
Mayor, Kāpiti Coast District Council, 5 September 2026 · Source

Where this council is at

The process so far.

Kāpiti Coast District Council is at the decision stage. The typical path is a briefing, a workshop, a council paper, community consultation where needed, a decision, and then going live once the RAS exists.

  1. Briefed

    Done

  2. Workshop

    Done

  3. Paper

    Done

  4. Consultation

    Done

  5. Decision

    Current

  6. Live

    Not yet

Decision log

On the record, newest first.

Append-only. Each entry records the date, the type of step, the decision and a link to the paper or report it comes from.

  1. 3 September 2026Resolution

    Council resolved to offer in-principle support for the RAS, joining 23 other councils. Council will sign the guarantee and consider an equity investment in due course.

    Councillor Bede Laracy raised a concern about council becoming "salespeople" without clearer details.

    Source

The three products here

What the RAS could mean in the Kāpiti Coast district.

Each block has the data slots the council data pipeline will fill, with the source each figure will come from. Where this council has an existing policy or a published figure, it is shown now.

Rates Postponement in Kāpiti Coast

~$4,000a year kept in pocket, on average

Ratepayers aged 55 and over, or eligible for a rates rebate, could postpone their rates until they sell. The RAS overview puts the average kept in pocket at around $4,000 a year.

55 and overRates rebate eligible20% equity
Residential rating units
Data coming

Ratepayers' Report 2026 / MCERT

Average residential rates
Data coming

Taxpayers' Union Ratepayers' Report 2026 (2024/25 data)

Rates as a share of NZ Super (single, couple)
Data coming

Derived; Work and Income rates from 1 April 2026

Population aged 65+ and share
Data coming

Stats NZ 2023 Census / 2025 estimates

Rates rebate claims, latest year and trend
Data coming

DIA / MCERT Rates Rebates Statistics, 2006/07 to 2025/26

Money kept locally at 4% uptake
Data coming

Rating units × average rates × 4%

Current council postponement policy

No rates postponement policy in the Retirement Commission 2023 survey.

Rates postponement calculator for Kāpiti Coast

Energy upgrades in Kāpiti Coast

$1,000+a year better off, after repayments

Energy IMPACT loans for solar, batteries and heat pumps, repaid over time, over the life of the gear. The RAS overview says a household with a decent solar system is around $1,000 a year better off after repayments.

Any ratepayerSolar, batteries, heat pumps20% equity
Households
Data coming

Stats NZ 2023 Census

Share heating with gas or wood
Data coming

Rewiring Household Electrification Model

Average household saving from the main upgrade bundle
Data coming

Rewiring regional report (permission pending)

Upfront cost of the bundle
Data coming

Rewiring regional report

District savings at 10% uptake
Data coming

Derived

Full regional report
Link coming

rewiring.nz/regional-reports

Energy upgrade calculator for Kāpiti Coast

Development contributions in Kāpiti Coast

30 yearsto spread $30-60k+ per dwelling

Deferred DCs let developers, including families adding a granny flat, spread contributions of $30,000 to $60,000 or more per dwelling over 30 years while the council is paid upfront. Kāpiti Coast District Council is a Tier 1 council under the National Policy Statement on Urban Development.

DevelopersGranny flats and infillNPS-UD Tier 1
Typical DC per dwelling
Data coming

Council development contributions policy (manual)

DC and financial contribution revenue, last five years
Data coming

Stats NZ LAFS, year ended June 2025

Residential consents per year
Data coming

HUD Local Housing Statistics

Population projection to 2053
Data coming

Stats NZ subnational projections, 2023 base

Estimated annual deferral pool at 35% uptake
Data coming

Derived from the base case assumption

NPS-UD tier
Tier 1

NPS-UD 2020, appendix tables

DC deferral calculator for Kāpiti Coast

Documents

Papers for Kāpiti Coast.

Members-only draft papers for this council, if any, are listed on the documents page. Scheme-wide documents are in the document library.

  • Kāpiti Coast District Council release: Council offers in-principle support (3 September 2026)
    Council news3 September 2026
    Open
  • Local Democracy Reporting: Kāpiti Coast council throws backing behind ratepayer loan scheme
    Media5 September 2026
    Open

Nearby

Other councils in Wellington.

Where Kāpiti Coast's neighbours stand. Status is set from the public record for every council.

Methodology. Status and the decision log are set by hand from council papers, releases and reporting, with the source linked on every row; nothing is inferred. Headline figures and the data slots above will be filled by a scripted pipeline from DIA/MCERT, Stats NZ, HUD, the Taxpayers' Union Ratepayers' Report and, with permission, Rewiring Aotearoa's Household Electrification Model, each figure carrying its source and date. Scheme figures are from the November 2025 RAS overview and are indicative. Record last updated 2 October 2026. Full methodology.